Saturday, February 26, 2011

More work on the pinwheel quilts

They keep growing. I think I have enough and then I sit down with my little pencil and my graph paper and work out how big a quilt I need if I'm going to do a bed quilt for a queen size bed (mine!!). This one will be too big for me to quilt myself.

And it's still in the making triangles stage. Thank goodness for triangle papers -

11 02 26 pinwheels progress

What you see is a pile of pinwheel blocks, a pile of pinwheels and more ready to be sewn.

I need this one done soon. we've been married almost five year and I haven't made a quilt for us yet. Is that grounds for something?

Saturday, February 12, 2011

Strippy Newspaper Pinwheels

Back before Christmas, I made a swack (that's a technical term) of pinwheels from a slew (another technical term) of black, red and white fabrics I have, most of them from Keepsake Quilting's scrap bags. (Have I mentioned that I really like their scrap bags?). With one square of each fabric, I ended up with 168 pinwheels, 2 each of 84 combinations. I intended to use them for a quilt I call Newspaper Pinwheels (Black and White and Re(a)d all over). (Bad joke.) (Bad old joke.) I'm still working on that quilt, but since I've redrafted it several times, I'm not quite sure where I'm going. It uses half the pinwheels.

The challenge then, is to use the rest of the pinwheels - and so, I am. These are some of the pinwheels:

11 02 12 the pinwheels

And this is how I started - I cut a swack (another of those technical terms) of quarter square triangles, so that I could make a strippy quilt.

11 02 12 starting

The Undercover Strippers got together today for a great day of sewing at the church.

11 02 12 at US saturday

By the end of the day, I have five strips. My layout says I need seven, but I am pretty sure I'll stop at six. This quilt is already much bigger than I had planned, and six strips will be plenty enough.

11 02 12 five strips

This one's for me - and will be in our quilt show in October, 2011. The girls laugh and tell me I can have my own little red and black corner. With half-square triangles.

Go, Sens, Go.

Wednesday, January 26, 2011

Quilting to deadline

The wedding is Saturday, January 29 - yes, that is this Saturday. I had my time all mapped out. Borders on by the Friday night - quilted by the end of the weekend, bound by Monday night.

Oh, right - that thing about best laid plans etc.

I got the Friday night right - this is as far as I got:

11 01 21 irish chain top

All basted by Saturday morning - after having to go to Fabricland to get more batting. Mine was just a teeny, tiny, eentsy bit too small, but too small is too small.

And then I hit the machine:

11 01 22 irish chain and me

Now, you must understand that I'm only smiling because I'm grateful to not have thrown the machine, quilt et al across the room. You know what quilting on a small throat machine is like: it's like this - inch by inch across the quilt - jamming it all the way. I have no patience. I really have no patience when all I can think of is "shoulda bought the home quilter. Shoulda bought the home quilter."

11 01 22 irish chain in the machine

Now to the really good news. I phoned my daughter to tell her that the quilt would be in the purolator by Wednesday morning (at a miserable expense, but when was it ever different when it comes to your kids?) and she said (God love her), "Mom, I don't think I'll give it to them until after the wedding."

The weight. It lifted from my shoulders then and there. You see, I sewed all day Sunday at home, except for going to church. By midnight, I could barely see straight - which was when I saw the entire block of quilting that had great tangled loopies on the bottom.

I ripped them out and went to bed.

Now I can finish with style.

Thursday, January 20, 2011

Irish Chain Blues - we're getting there

The centre is finished. This is my last trip to the ironing board before putting on the borders.

11 01 20 irish chain centre

It's set five by seven - 13 1/2 inch blocks. It's been a lot of sewing straight lines, getting up early very morning to get it done. My deadline is this weekend, because it's got to get into the mail to get to Erica on time.

So.... this is where I spent my morning - at the wonderful Kickass Country Store in Plumas, Manitoba. I have a great stash, but it's mostly fat quarters. My idea of a big cut of fabric is .4 of a metre - never enough for a border.

11 01 20 kickass

So off I went - in the frigid cold of a Manitoba January. I've always wondered about living in a country where the "hot spot" has a temperature of minus 28.


11 01 20 plumas

Beautiful downtown Plumas. It's cold.

Wednesday, January 12, 2011

We're making progress

My Irish Chain Blues quilt - we're making progress. This is one of my 2010 must finish projects, because I've promised it to my daughter. All the main blocks are done and now I'm finishing up the "connector" blocks.

11 01 09 irish chain blocks

There are a total of 18 - this for a quilt set 5 by 7.

The connector blocks are in the making -

Irish Chain Blues 11 01 12

What you see on the chair are the finished main blocks, some of the connector blocks and the strip sets for the connector blocks. Lots of sewing straight lines and then cutting things apart. The good news so far is that no half-square triangles to square up.

My friends won't recognize me without half-square triangles.

Saturday, January 1, 2011

the PhD Challenge

I found the PhD challenge a day too late (that's what happens when I travel to Ottawa to visit my daughter for Christmas, but don't take my laptop), but I'm going to read along and do it anyway.

No photos - but I will get them up and onto the blog.

I hope an almost new project fits within the spirit. Just before I went to Ottawa, Erica asked me for a quilt for her friend who is getting married. I've cut the strips, which means it's started before 2011!!

Photos tomorrow. Today - January 1 - we clean the house.

Edited to add a photo today. This is the first of the strata for the Irish Chain.

2011 01 Irish Chain first strata

Sunday, November 21, 2010

A quilting weekend

A quilting day on Saturday with the Undercover Strippers. (Where did we get that name?)

I got the machine set up all set to go on my Newspaper Pinwheels:

10 11 20 newspaper pinwheels

One portable sewing machine, one Ott light, one big board laid across a table, the project and assorted tools of the trade - everything necessary for a Saturday with the girls.

The morning was spent working on Newspaper Pinwheels:

10 11 19 pinwheels progress

.... but the rest of the day was spent finishing the quilting on Tres Triangles. This is such a simple quilt, made out of leftovers and swaps and a few lights thrown in because, after all, no-one swaps neutrals:

10 11 20 tres triangles being quilted

This one will be for the house - just a couch quilt, probably for naps ..... and getting up in the middle of the night and deciding it's better to sleep on the couch.